Amendment Slip No.-74, dated- 03.10.2022 to the G&SR of NCR
01 Existing SR 4.10/2 is deleted and substituted as under- (A/Slip No.-74)
SR 4.10/2 Following precautionary conditions must be followed during NI work at 30 Kmph
(i) Speed can be raised up to 30 kmph with clamping and padlocking of points by using suitable clamps.
(ii)No separate temporary panel is needed and only free home signal shall be given.
(iii) Integrity of point shall be checked by Operating Staff as per extant practice adopted during NI.
(iv) Physical verification of track shall be done by Station Master physically.
(v) Necessary safety directions should be incorporated in temporary working instructions for non-interlocking at maximum speed 30 Kmph with suitable infrastructural support as deemed necessary.
02. Existing note under SR 4.11/1(a)(i) is deleted. (A/Slip No.-74)
एनसीआर के जीएंडएसआर में संशोधन पर्ची सं.-74, दिनांक- 03.10.2022
01 मौजूदा एसआर 4.10/2 हटा दिया जाता है और इसे निम्नानुसार प्रतिस्थापित किया जाता है।
SR 4.10/2 30 Kmph . पर NI कार्य के दौरान निम्नलिखित एहतियाती शर्तों का पालन किया जाना चाहिए।
(i) उपयुक्त क्लैंप का उपयोग करके पॉइंट्स की क्लैम्पिंग और पैडलॉकिंग के साथ गति को 30 किमी प्रति घंटे तक बढ़ाया जा सकता है।
(ii) अलग से अस्थायी पैनल की जरूरत नहीं है और केवल होम सिग्नल दिया जाएगा।
(iii) NI के दौरान अपनाई गई मौजूदा प्रथा के अनुसार ऑपरेटिंग स्टाफ द्वारा प्वाइंट की सत्यता की जांच की जाएगी।
(iv) ट्रैक का भौतिक सत्यापन स्टेशन मास्टर द्वारा भौतिक रूप से किया जाएगा।
(v) 30 किमी प्रति घंटे की अधिकतम गति से नॉन-इंटरलॉकिंग के लिए अस्थायी कार्य निर्देशों में आवश्यक सुरक्षा निर्देशों को शामिल किया जाना चाहिए, जैसा कि आवश्यक समझा जाए।
02. एसआर 4.11/1(a)(i) के तहत मौजूदा नोट को हटा दिया जाता है।