Terminology used in a Caution Order with their Meanings:

Terminology used in a Caution Order with their Meanings



1. O.E.S. – OBEY ENGINEERING SIGNAL


2. C.T.R. – COMPLETE TRACK RENEWAL


3. T.R.R. – THROUGH RAIL RENEWAL


4. L.W.R. – LONG WELDED RAIL


5. C.W.R. – CONTINUOUS WELDED RAIL


6. T.S.R. – THROUGH SLIEEPER RENEWAL


7. S.W.R. – SHORT WELDED RAIL


8. U/S – UNSERVISABLE SLEEPER


9. S.E.J. – SWITCH EXPANSION JOINT


10 U.C. – UNCONSOLIDATED (LESS BALLAST)


11. S.D.I.R. – STOP DEAD IF REQUIRED


12. P.B.R. – PULLING BACK OF RAILS


13. R.A.T. – RAILWAY AFFECTED TANK


14 T.F.R. – THROUGH FITTINGS RENEWAL


15. T.B.T.R. – THROUGH BRIDGE TIMBER RENEWAL


16. T.R.R. – THROUGH WELD RENEWAL


17. T.T.R. – TROUGH TURNOUT RENEWAL


18. T.B.R. – THROUGH BALLAST RENEWAL


19. B.C.M. – BALLAST CLEANING MACHINE 20. D/S DEEP SCREENING


21. PQRS – PLASSER QUICK RELAYING SYSTEM


22. T.R.T. – TRAIL RELAYING TRAIN


23. R.O.B. – RAIL OVER BRIDGE


24. I.M.R. – IMMEDIATE REMOVAL RAIL (WITHIN 2 Or 3 DAY WHEEL BURNT RAILS)