1. O.E.S. – OBEY ENGINEERING SIGNAL
2. C.T.R. – COMPLETE TRACK RENEWAL
3. T.R.R. – THROUGH RAIL RENEWAL
4. L.W.R. – LONG WELDED RAIL
5. C.W.R. – CONTINUOUS WELDED RAIL
6. T.S.R. – THROUGH SLIEEPER RENEWAL
7. S.W.R. – SHORT WELDED RAIL
8. U/S – UNSERVISABLE SLEEPER
9. S.E.J. – SWITCH EXPANSION JOINT
10 U.C. – UNCONSOLIDATED (LESS BALLAST)
11. S.D.I.R. – STOP DEAD IF REQUIRED
12. P.B.R. – PULLING BACK OF RAILS
13. R.A.T. – RAILWAY AFFECTED TANK
14 T.F.R. – THROUGH FITTINGS RENEWAL
15. T.B.T.R. – THROUGH BRIDGE TIMBER RENEWAL
16. T.R.R. – THROUGH WELD RENEWAL
17. T.T.R. – TROUGH TURNOUT RENEWAL
18. T.B.R. – THROUGH BALLAST RENEWAL
19. B.C.M. – BALLAST CLEANING MACHINE 20. D/S DEEP SCREENING
21. PQRS – PLASSER QUICK RELAYING SYSTEM
22. T.R.T. – TRAIL RELAYING TRAIN
23. R.O.B. – RAIL OVER BRIDGE
24. I.M.R. – IMMEDIATE REMOVAL RAIL (WITHIN 2 Or 3 DAY WHEEL BURNT RAILS)